Cogswell Redevelopment

Cogswell Redevelopment

Halifax, Nova Scotia

» Scope of Project

The Cogswell District Project aims to revitalize the 1960s-built Cogswell Interchange area, transforming it from an overbuilt interchange into a vibrant downtown neighbourhood. The $122.6M initiative involves reinstating the original street grid network, realigning and upgrading underground utilities, integrating green energy infrastructure, and constructing 6 building lots and 4 parks. This transformation marks a significant effort to create a thriving community hub in the heart of downtown, enabling future development.

» Execution

An interdisciplinary team of WSP Planning, Transportation, Urban Design and Landscape Architecture professionals furthered the vision for the Halifax Regional Municipality to direct the transformation of 10.5 hectares of land from a highway interchange to a vibrant mixed-use district, reconnecting existing heritage districts and downtown with the waterfront. The redevelopment of an area of this scale in the urban core presented many design and construction challenges. This included: integration of new infrastructure with existing infrastructure which dates back 150 years; ensuring existing municipal infrastructure remains operational during the construction stage as to maintain minimum service disruption to existing customers; designing for the impact of climate change on stormwater and wastewater systems and increased demands on the municipal system stemming from the development; undergrounding of all utilities and incorporating a new district energy system into the design and moving 150,000 cubic metres of material, some of which was contaminated and had to removed from the site.

» Project Highlights

  • Cost: $122.6 million
  • Reimagined on-street transit hub & Bus Rapid Transit
  • 7 km of new roads and 1.1 km of separated bike lanes
  • Striving for Rick Hansen Gold certification
  • 5 municipally owned development blocks

» Company Contact

WSP Canada Inc.

www.wsp.com/en-ca